iBwave-certified design for distributed antenna systems and BDA installations — modeled in software, validated against measured RF data, and packaged for AHJ submittal.
Before we touch the design, we close five items every time:
We package the design into the AHJ-required format (typically PDF + iBwave model export) and submit through the local portal — DallasNow (ProjectDox), eTRAKiT, or Accela depending on the city. Plan-review timelines run 3–6 weeks in DFW; we sequence the project schedule around the slowest AHJ on the project.
Texas's adoption of the 2024 IFC pulled thousands of existing buildings into ERCES annual-testing scope. Enter your address and we'll tell you if yours is likely one of them — in 60 seconds.
Check your building →